Filter success stories

Select technology

Select country

Select business vertical

Remote and integrated network management of the various facilities

La Giocomotiva needed to implement a high-performance network that can be easily managed remotely for all the different facilities located throughout Italy.

High-performance and easily managed remote Wi-Fi for all the hotels in the chain

The Sina Hotels chain needed to upgrade its network infrastructure in order to update the Wi-Fi service.

FEMW Irlandesas El Soto school (Madrid)

has gained recognition from the Google Reference School Network, thanks to the digitisation of its classrooms and educational platforms, which are supported by modern network infrastructure with Wireless and D-Link Switching solutions that have been installed by its partner Egson

Hotel Mayfair in Paris places its trust in D-Link

Every day the hotel team welcome an affluent clientèle from overseas, therefore the establishment needs to guarantee a flawless security system. The D-Link cameras enable unlimited camera recording

Direct from your hotel room to your private cinema lounge

Cinema 8 offers an exceptional high-tech world of entertainment.

The Positive Impact of Physical Security in Schools

The school needed a complete, modern surveillance solution, one that would provide a smart, practical and proactive approach to school security and an upgrade on infrastructure including switches, cameras and software.

Wincheap Foundation Primary School Improves Speed and Coverage with D-Link’s Latest Centrally Managed Network

“Due to the dramatic increase in devices across the school it was essential for us to upgrade our wireless infrastructure.” Phil Wilson, Senior ICT & Performing Arts Technician at Wincheap School

WifiZone – Wireless revolution in the community areas

Free quality Wi-Fi services all around Budapest, Hungary.

Two becomes one – Sir John Gleed School unifies network infrastructure with D-Link

The challenge for the school was ensuring that the new network for the Boys’ School was working from day one, particularly as it needed to be installed over the summer holidays.